June 13, 2001 | Minutes | |
June 6, 2001 | Minutes | |
May 30, 2001 | Minutes | |
May 23, 2001 | Minutes | |
May 17, 2001 | Minutes | |
May 9, 2001 | Minutes | |
May 2, 2001 | Minutes | |
April 18, 2001 | Minutes | |
April 11, 2001 | Minutes | Isometric view of a revised MCM wall concept (PDF) |
April 4, 2001 | Minutes | Summary of the HPK meeting (PDF) |
March 28, 2001 | Minutes | |
March 21, 2001 | Minutes | |
March 14, 2001 | Minutes | |
March 7, 2001 | Minutes | |
February 28, 2001 | Minutes | Pull tests on Nusil adhesive (PDF) |
February 7, 2001 | Minutes | |
January 24, 2001 | Minutes | |
January 17, 2001 | Minutes | |
January 10, 2001 | Minutes | Matt's thermal test results for Ag-epoxy conductivity (PDF) |
January 3, 2001 | Minutes | |
December 20, 2000 | Minutes | BJ's drawing of the MCM (PDF) |
December 13, 2000 | Minutes | BJ's drawing of the tower side (PDF), Hytec concept for the tower/grid flexure attachment (PDF1), (PDF2), (PDF3) |
December 6, 2000 | Minutes | |
November 29, 2000 | Minutes | Sandro's proposed glue pattern (PDF), Gwelen's presentation on the TMCM interface (PDF), Hartmut's note on the recommended number of Si detectors to procure (PDF) |
November 22, 2000 | Minutes | |
November 15, 2000 | Minutes | |
November 8, 2000 | Minutes | |
November 1, 2000 | Minutes | |
October 25, 2000 | Minutes | |
October 18, 2000 | Minutes | Draft TKR level-3 specifications (PDF) |
October 11, 2000 | Minutes | Hartmut's note on tray material (PDF) |
October 4, 2000 | Minutes | Detector measurements using CMS electronics, from Pisa: (PDF1), (PDF2), (PDF3) |
September 27, 2000 | Minutes | Alec's sketch of a spring-contact test fixture (PDF) |
September 20, 2000 | Minutes | Pisa results with GLAST detectors & CMS electronics (PDF), Note on tray core material choices (PDF) |
September 13, 2000 | Minutes | Discussion of payload attachment options (PDF) |
September 6, 2000 | Minutes | |
August 30, 2000 | Minutes | Hytec work plan summary (PDF) |
August 16, 2000 | Minutes | Adhesive conductivity testing plan (PDF), GTFE pad and size layout (PDF) |
August 9, 2000 | Minutes | Depletion voltage of STM detectors (JPEG), CV curve of one STM detector (JPEG), Depletion voltage vs leakage current (JPEG) |
August 2, 2000 | Minutes | Leakage current of STM detectors (JPEG), Charge Sharing, comparing MC and data (JPEG) |
July 26, 2000 | Minutes | |
July 19, 2000 | Minutes | Jose's simulation results (PDF), Strain Test Plan (PDF) |
July 12, 2000 | Minutes | |
July 5, 2000 | Minutes | LET Table for the SIRAD Tandem VDG (PDF), |
June 28, 2000 | Minutes | New concept for isolation of test ladders (PDF), |
June 21, 2000 | Minutes | |
June 14, 2000 | Minutes | |
June 7, 2000 | Minutes | |
May 31, 2000 | Minutes | Concept for isolation of test ladders (PDF), Hytec analysis of stress in Si (PDF) |
May 24, 2000 | Minutes | Purity requirements for adhesives in contact with detectors (PDF) |
May 17, 2000 | Minutes | |
May 10, 2000 | Minutes | Wire bonding test on right-angle interconnect (JPEG), |
May 3, 2000 | Agenda Minutes |
stress relaxation in lead by Gwelen
(PDF), Pb/C laminate for superGlast converters by Robert (MSWord) |
April 26, 2000 | Agenda Minutes | preliminary drawings for the ladder assembly fixture by BJ (PDF1 PDF2) |
April 19, 2000 | Agenda Minutes | |
April 12, 2000 | Agenda Minutes | |
April 5, 2000 | Agenda Minutes | thermal requirements by Martin (MSWord) |
March 29, 2000 | Agenda Minutes | adhesive research by Gwelen (MSWord) |
![]() Robert P. Johnson |
Last modified: Mon Jul 17 17:38:56 PDT 2000 |