H8 Beam Test 1996
Author: Riko Wichmann
This page was created March 19, 1996, last modified June 26,1996
Planning Status for the Beam Test
Binary Read-out Detector Assembly
Unfortunately, some postscript images cannot be previewed with ghostview, but you should be
able to print them!! If you're not able to get a printout, load the gif version. The
quality is not as good. Report any problems to Riko.
Module Test in the Labs
- Thermal measurements using the M-Module
06/15/96
Other H8 Beam Test related Links
H8 Beam Test related Publications
Back to Silicon Home Page